Year
              2001-2004
          Location
              Songea
          Status
              Completed
          Category
              
          We were in association with DORSCH CONSULT of the Federal Republic of Germany undertaking the project of immediate measures aimed at improving the water supply to the town through improvements to the existing system.
The assignment is in the stages of Design and Supervision. A billing system shall also be established in order to ensure sustainability through own funding.
SERVICEPLANS inputs are in the Design stage: Water Supply Engineer, Design Engineer. Hydrologist. Financial Analyst, Sociologist, Environmentalist,
The planned input by SERVICEPLAN in the implementation stage is:
Deputy resident Engineer, Site Inspector, Quantity Surveyor, and CAD Technician 